— Day 1 — Day 2 — Day 3 — Day 4 — Day 5 —
Summary:
Today was the third day of the Martian Lander Project. The fun day. Testing day! Each class traveled down to the auditorium, egg in hand, and tested their landers from a height of about 5 meters. Results were… messy.
Students used the data tables in their lab report (posted below) to keep track of each group’s results. This included the cost, the fall time (recorded with a stopwatch), the end result (broken or safe), and their observations. A fun day was had by all. Except a few of the astronauts.
Resources:
September 27-29 – Martian Lander Report (pg118).docx